Designing out health-and-safety risks at the design stage itself, rather than leaving the contractor to manage them once construction begins. It's the design-stage half of the CDM Regulations' logic - a designer choosing a lighter cladding panel that two people can lift safely, instead of one requiring a crane and a higher-risk lift, is design for safety in practice.