A lean-construction production planning method built around collaborative, reliable short-term commitments from the people actually doing the work - the "last planners" - rather than a top-down master schedule alone. Developed by the Lean Construction Institute, it works backward from milestone dates to weekly work plans that foremen and subcontractors actually commit to, then tracks a "percent plan complete" metric to catch unreliable commitments early rather than discovering a slipped schedule at the end.
Last Planner System
Last Planner System
Related:Lean Construction