Approved Document C covers site preparation before building starts - dealing with contaminated ground, unstable ground, and moisture resistance for the finished structure. It's the Approved Document most directly informed by a project's Ground Investigation Report, since the site conditions that report uncovers drive which C-compliant measures the design needs.