A formal contractual claim granting a contractor additional time to complete the works, usually due to a delay outside their control. A well-documented model and schedule history is exactly what an EOT claim needs to prove its case - showing precisely when a design change or a late information delivery actually pushed back the construction sequence, rather than the delay being the contractor's own fault.
Extension of Time
Extension of Time (EOT)