A short-term rolling schedule (typically 2-6 weeks) used in lean construction to plan the work that's actually about to happen. A Look-Ahead Schedule is a short-term rolling plan - usually two to six weeks - that breaks the master programme down into the specific tasks each trade needs to prepare for right now, checking that materials, labor, and prerequisite work are actually ready. It's the core planning tool behind the Last Planner System.