A Non-Conformance Report (NCR) formally records work that fails to meet the specification or an Inspection and Test Plan's requirements, capturing what went wrong, its cause, and the corrective action agreed before the work can proceed or be accepted. It's the paper trail Root Cause Analysis draws on when the same defect keeps recurring.
← BIM GlossaryDocuments