A live, maintained list of the risks identified on a project, each one scored, assigned an owner, and tracked with a mitigation plan. A design-stage risk register might flag an unresolved geotechnical uncertainty; a construction-stage one tracks a live weather delay. It's reviewed at every stage gate, and closing out an entry usually means either the risk was designed out or a mitigation genuinely worked - not that it was quietly forgotten.