A lean-construction practice where cost and value targets are set collaboratively up front, and design decisions are made to meet them - the reverse of designing first and costing afterward. It puts the owner, designer, and contractor in the room together from the start, treating the target cost as a design constraint rather than an estimate produced after the design is already fixed - closer in spirit to integrated project delivery than to a traditional design-bid-build sequence.