UK health-and-safety regulations that require design and construction risk to be identified and managed from the earliest design stage, with the model itself often used to flag hazards. CDM shifts safety responsibility upstream - designers must actively design out foreseeable hazards (a difficult access route, a maintenance task requiring work at height) rather than leaving all risk mitigation to the contractor on site, and the Health and Safety File is the document that carries this information into operation.