The delivery schedule of the information. Two documents from the ISO 19650 world that live alongside the BEP. A TIDP (Task Information Delivery Plan) is one team's delivery plan: which files and models that team provides, when, and at what level of information. The MIDP (Master Information Delivery Plan) combines all TIDPs into a single project-wide delivery plan - the schedule of the information, not of the construction.

If the EIR says "what", the MIDP says "who and when".